There was major progress on the skills loop today.   The work included:

A series of rock step ups (or drop downs going the other way).  These progress from just a few inches to about 22 inches in height.   There are multiple lines.  There are 3 distinct points of steps with each point having at least two different lines.  Between the second and third point there is a 18 inch drop off of a ledge as well.


This is the second point step up.   


This is the second point closer up.  
The third point is taller, but has 3 distinct lines.

The second project for the day was a simple skinny with low risk.   1' off the ground.   24 feet long.   8 inches wide.  


Simple, straight forward skinny with a little risk involved.
After you clear the third rock step up you have a short recovery and then come to this. 

The third project for the day was somewhat unplanned.   After the bobcat work for the rock step ups, we were left with some big piles of dirt.   We built a series of dirt rollers (think large rollers on a pump track).   These occur just after the railroad ties.   The dirt rollers are on about a 12' distance apart from one another (measured from the high point on the pile).   They are of varying heights, but reach over two feet tall (close to 3 feet in some instances).  

The dirt rollers will undoubtedly need some refinement, we need to see how they ride and then adjust them, but should evolve into a fun feature.   I was too tired to snap a photo.

Saturday, June 30, 2012

First skills structure

 Setting the posts

 Stringers going on

The last section gets skinny!


 Clay and Cliff surveying the work

The exits going on, progressively skinnier


The work crew (missing Justin who had to split)

Friday, January 13, 2012

New Map




Sunday, January 8, 2012

Trail change

There is a significant reroute to be aware of at Stocksdale.   We will put out a new map at some point, but I will describe it here, you can reference the map to the right. 


On the current map you will note at marker #5 there is a longer option and a shorter option that rejoin at marker #6.   


Today we completed a project that removes the intersections at #5 and #6 (the markers have been removed).   The short route is now incorporated into the main trail.


This accomplished two goals, to lengthen the main trail and to remove the intersections.    We also remove some trail that was eroding a bit.